Our largest plant: 1,080 m² of panels on the roof of the MPS factory in Bonfol (canton of Jura). 609 modules, 220 kWp, about 220,000 kWh per year.
Commissioned in July 2021 and inaugurated on 26 November 2021 in the presence of MPS CEO Nicola Thibaudeau and Jura minister Martial Courtet. Built by Helion, with the support of the Alternative Bank Switzerland.
Weather on site
- Temperature
- 10.0 °C
- Solar irradiance
- 32 W/m²
- Humidity
- 99 %
- Pressure
- 992 hPa
- Wind
- 6 km/h
- UV index
- 0
- Sun
- 07:30 → 17:01
overcast
↘ falling
from the east · average 4 km/h
low
sunrise and sunset
Production
Solar irradiance received on site (W/m²)
Location
In the news

Inauguration de HoruSolar IV
Le vendredi 26 novembre, nous avons inauguré notre nouvelle centrale solaire, HoruSolar IV. D’une superficie de 1’080 m², couvrant le toit de l’usine MPS…

Mise en service de HoruSolar VII
Nous sommes très heureux de vous annoncer que nous avons mis en service, le mercredi 19 avril à 15 heures, notre nouvelle centrale photovoltaïque…
Notre centrale HoruSolar III a 3 ans…
Le 30 septembre 2018, cela faisait 3 ans que nous avions mis notre nouvelle centrale solaire HoruSolar III en service et qu’elle produisait ses…
Our other solar plants
- 0.08 kW
HSI+II
HoruSolar I+II
2000 Neuchâtel
- Power
- 2.5 kWc
- Area
- 20 m²
- Since
- 2004
1.20 kWHSIII
HoruSolar III
1400 Yverdon-les-Bains
- Power
- 30 kWc
- Area
- 172 m²
- Since
- 2015
6.31 kWHSIV
HoruSolar IV
2944 Bonfol
- Power
- 220 kWc
- Area
- 1’080 m²
- Since
- 2021
- 0.32 kW
HSV
HoruSolar V
2016 Cortaillod
- Power
- 26 kWc
- Area
- 111 m²
- Since
- 2022
4.46 kWHSVII
HoruSolar VII
2500 Bienne
- Power
- 147 kWc
- Area
- 691 m²
- Since
- 2023
1.82 kWHSVIII
HoruSolar VIII
2944 Bonfol
- Power
- 70 kWc
- Area
- 400 m²
- Since
- 2024


